What We Do

Services

Every service we offer, from a brand new build to fixing what someone else got wrong.

Home › Services

Everything we take on

Every job below is one we do ourselves across Huber Heights.

Deck Installation

We frame new decks with pressure-treated joists on concrete footings poured below the frost line, so the structure doesn't heave in winter. Ledger boards get flashed and lagged into the rim joist, not just nailed through the siding. You pick the decking material and railing style, we handle the layout and the permit.

Custom Deck Design

Some lots need a deck that steps down with the grade or wraps around a tree instead of a straight rectangle off the back door. We sketch the layout with you, work out the footing locations, and figure out stairs and railing before any lumber gets cut. Multi-level decks and built-in seating add framing time, and we'll say so up front.

Deck Repair

A soft spot in the decking, a post that's started to lean, or a railing that moves when you lean on it usually means something underneath has rotted or come loose. We pull the bad boards or hardware, check the joists and posts behind them, and replace only what's actually failed. Sometimes that's three boards, sometimes it's the whole frame, we won't know until we open it up.

Deck Staining & Sealing

Wood decking left bare grays out and starts to cup within a couple of summers in this climate. We pressure wash, let it dry out fully, sand down any rough spots, then apply a stain and sealer rated for UV and standing water. Plan on doing this again every two to three years depending on sun exposure.

Composite Decking Installation

Composite boards skip staining entirely and won't splinter, which is why a lot of homeowners switch over during a rebuild. We still frame it the same way underneath, with proper joist spacing and hidden fastener systems so there's no screw heads showing on top. It costs more per square foot than pressure-treated pine, but there's nothing to maintain after.

Deck Railing Repair & Installation

Loose balusters, a top rail that wobbles, or spacing wider than code allows, we fix all of it. Ohio building code wants gaps under 4 inches so a small kid can't get a head through, and a lot of older decks don't meet that anymore. We can rebuild just the railing without touching the decking if the frame underneath is still solid.

Deck Board Replacement

If the frame is still sound but the decking itself is cupped, splintering, or rotted through in spots, you don't need a whole new deck. We pull the bad boards, check the joists underneath for soft spots while they're exposed, then replace with matching or upgraded decking.

Deck Demolition & Removal

Old decks get torn down and hauled off, including any buried footings if you're planning something different in that spot. We check first whether the existing frame is worth keeping before we demo it, sometimes resurfacing costs less than a full rebuild.

Covered Decks & Pergolas

A pergola or a roofed section over part of the deck cuts down on how much sun and rain the boards take directly, which slows fading and warping. We frame these into an existing deck or build them as part of a new one, sized to actual rafters and snow load, not just eyeballed.

Deck Framing & Structural Repair

This is the part nobody sees once the boards go down, joists, beams, posts, and the footings they sit on. If a deck feels bouncy or uneven, the problem is almost always here rather than in the decking itself. We get underneath it, check for rot and undersized framing, and rebuild to current code if what's there won't hold.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Huber Heights, OH

Deck installation and repair covers Huber Heights and the towns around it.

Huber Heights, OH
Dayton, OH
Springfield, OH
Kettering, OH
Beavercreek, OH
Fairborn, OH
Troy, OH
Xenia, OH
Piqua, OH
Vandalia, OH
Englewood, OH
Tipp City, OH
Common Questions

Things worth asking

Questions that come up once a deck project is underway.

Do I need a permit to build a deck in Ohio?
Most townships in the Dayton area require a permit for any deck higher than 30 inches off the ground or attached to the house. Permit applications and inspection scheduling are typically handled as part of the deck installation process.
How long does it take to build a deck?
A standard single-level deck usually takes one to two weeks from footings to final board, weather permitting. Multi-level decks, pergola additions, or composite decking with hidden fasteners can add several more days.
Can you work within a specific budget for my deck?
Decking material is usually the biggest lever on price, pressure-treated pine costs less than composite or cedar. Simplifying the layout, like fewer stairs or a single level instead of a wraparound, also brings the number down.
Do you guarantee your deck work?
Workmanship on framing, footings, and installation is covered under warranty for a set period after completion, with details spelled out in the written quote. Manufacturer warranties on composite decking or hardware are separate and handled directly with the supplier.
Who will I be dealing with during the project?
One point of contact handles scheduling and updates throughout a deck project, rather than switching between different people. Questions about materials, timeline, or changes to the plan go through that same person.
What decking materials do you work with?
Pressure-treated pine, cedar, and composite decking brands like Trex and TimberTech are all standard options. Pine costs less upfront, cedar has a natural look but takes more upkeep to hold its color, and composite costs more but skips staining entirely.
Can I still use my yard while the deck is being built?
Most of the work is contained to the deck footprint and the immediate area around it for material staging. Pets and kids should stay clear of the work zone while footings are being dug and lumber is being cut.
What should I do to prepare my yard before deck construction starts?
Clear furniture, grills, and planters away from the existing deck or the area where the new one is going. Mark any sprinkler lines, buried cables, or dog fence wires so footing holes don't hit them.
What happens if you find rot or damage once the old deck is torn off?
Hidden rot in ledger boards, rim joists, or support posts gets flagged before any new framing goes up, since building over it just hides the problem again. Any additional repair work is priced separately and reviewed before proceeding.
How do I maintain a new deck once it's finished?
Wood decking should be cleaned and resealed every two to three years to stop graying and cupping, sooner with heavy sun exposure. Composite decking just requires periodic washing to clear mildew and debris out of the board grooves.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (937) 446-6189